向调制提供工程和服务的一般条件

第1条申请范围

The present General Contract Conditions (hereinafter called "General Conditions of Works") shall apply to all contracts (hereinafter called "Contract/s") entered into between Modula S.p.A. (hereinafter called "Modula") and its contractors (hereinafter called "Contractor") for the supply or execution of a work (hereinafter called "Work"). It can also be applied, mutatis mutandis, to a service contract (in that case the term "Work" shall be replaced by "Service"), unless the provisions of the present General Conditions of Works are not clearly inconsistent with the activity to be performed pursuant to this type of contract. The present General Conditions of Works form an integral and essential part of the formal order (hereinafter called "Order") issued by Modula to which they are attached or mentioned together with the documents referred to in the Order and in the present General Conditions of Works, of which the Contractor hereby declares to be fully aware.

第2条合同文件

2.1作为一般规则,规定承包商施工的文件如下:
a)订购
b)Modula最终客户的技术规范和标准/规则
C)附图
d) 工作时间表
e) Modula的一般工程条件
f)其他相关文件。
2.2这纯粹是一个指示性清单。因此,根据与工程相关的性质和情况,上述文件可能会缺失一个或多个,也就是说,订单可以由不包括在前一段所列清单中的其他文件进行补充。
2.3上述合同文件的规定为补充。如果上述合同文件的规定发生冲突,则以各文件的规定优先于第2.1段下一份文件的规定。
2.4违反或以其他方式向承包商插入其发票,票据,通信或任何其他文件的现行作品的普通条件的任何条款,否则尚未被撰写,除非策划以书面形式同意同意。
订单中关于时间的日期和规定始终是必要的。
2.6每个服务合同必须以书面形式。只有在核制的采购部门制定的情况下,订单和以下修改将是绑定的,并且他们是编写和订阅的。承包商应避免合同未提供的任何作品或活动。

第3条独立承包商

3.1工作的顺序描述由承包商通过他的组织,并在他自己的风险进行,没有向任何MODULA依赖和/或从属地位。承包商的义务是达到订单工作组提出的结果,这一义务仍然适用,即使承包商必须遵守的规则,规定,标准,技术咨询等。
3.2在执行订单时,承包商应考虑到可能影响他的活动的所有因素(季节,假期,由审核日期或第三方开始的活动等)
3.3通过接受订单,承包商宣布,他充分了解工作的性质和技术,技术和功能特征,并且他已经正式考虑了与执行工作的所有因素,情况,不确定性。OPY May影响工作的执行和相关价格。承包商应原有权享有任何索赔,由于作品的减速或执行工作的延迟,而不是由于在秩序被接受时因情况而申请的情况提高成本。
3.4在接受订单后,承包商:
a)对《秩序》中所述工作的开展,包括对Modula和第三方,承担全面的技术和行政责任;
b)宣布他可以提供包括财务手段和本组织的手段,以保证订单中提到的履约,并为其雇员的活动负责,包括可能由他们造成的损害赔偿责任调制和/或调制或第三方的员工;
c)如果需要,应协调,他的核制定的活动,提出问题和要求对工作的实现有用的问题;
d) 尽管承包商有责任正确及时地履行合同,但承包商应及时以书面形式通知MMODLA可能妨碍其按照订单中规定的条件和条款执行工程的事件和情况。
3.5对承包商执行工作的所有情况的所有情况缺乏,错误或不足的评估不得豁免后者履行从订单中获得的所有义务。

第4条结束合同

4.1自Modula收到各自的副本(订单确认书)并经承包商正式签字接受之时起,合同即已签订,订单即不可撤销。
4.2每当调制器和承包商与远程网络网络一起连接时,可以访问上述顺序和上述确认。在这种情况下,合同应得出结论,何时何地应签订不可撤销,因为莫德拉电子邮箱在南部电子邮箱中的信息服务承包商提供的确认,须遵守下文第4.3段的规定。
4.3如果Modula没有接收承包商签署的接受或远程传送的订单副本(订单确认),在任何情况下,承包商在命令中规定的开工都应被视为接受了本《工程一般条件》和命令中规定的具体条件。
4.4关于作品有关的任何类型的请求,无论是书面还是口语,都不会对调制构成,直到审核问题,该命令正式签署其适当的赋权代表。
4.5如果承包商发现材料的顺序错误或遗漏Modula出具有关商业或技术方面相关工作提供,他应当立即通知Modula的这种情况下,以使它能够提供适当的修正和修改的订单。

第5种技术规格

5.1承包商应按照订单和其他合同文件(如有)以完美的熟练方式并采用最先进的可用技术按时开展工作。在这方面,承包商应自行负责并自费确保工程符合Modula传达的或法律、法规、统一标准中规定的所有技术规范,在工程实施期间生效或可能生效,直至工程验收。
PAGE N. 3/20经批准签订MODULA S.p.A.的
5.2因此,无论Modula有什么法律义务,承包商应充分了解适用于本工程的所有技术规范,并要求Modula提供对承包商开展本工程可能有用或必要的所有可用信息。
5.3除了目前有效的规则和法规设想的所有文件以及可能生效的所有文件还应提供与安全和健康法律有关的所有文件的副本。

第6条承包商的具体义务

6.1承包商应确保,他唯一的责任和自费的作品进行完全遵守所有的法律、法规和规范的任何权威,无论是武力或可能生效期间的执行工作,与工程的执行有关的,直到验收为止。
6.2承包商还履行义务并执行互补活动,虽然未按顺序描述或提及,但有必要以完美的工作人员方式完成工作,并确保适用于商定的使用。承包商必须尽可能彻底地执行工作,尽可能广泛地,即使订单仅描述其中的基本部分。
6.3更具体地说,承包商应执行工作符合所有现有的法规关于健康和安全、卫生、环境和生态、人类工程学、防火、不时生效在意大利,在欧盟和国家的目的地的工作。因此,承包商应提供所有所需的文件,并同样确保与工程有关的所有操作完全符合实施时生效的劳工法规。具体但不限于,承包商应:
(一)尊重安全和保障规定;
(b)对其人员对应不应低于适用于适用于每个特定雇员类别的集体协议提供的薪酬;
(c) 为工人提供法律规定的所有保险,如雇主责任保险、疾病保险和社会保障保险,并遵守现行劳动法;
(d)采取所有预防措施,以防止在实际工作绩效和辅助行动中损坏人和性质,例如运输,交付,检查等;
(e)中执行与高度合格的和技术熟练的人员按照工作的性质的作品;
(f)采取必要措施,防止因施工而产生任何形式的污染。
6.4无论何时,即使部分活动发生在Modula的场所或第三方的场所,承包商人员都应遵守其中所有有效的规则、条例和纪律规定。
6.5为此目的,承包商应通知他的雇员和/或他的承包商与审核或第三方房屋的活动相关的具体风险,并因此安排所有个人和集体保护和预防措施,需要和适当在执行工作期间防止事故和损坏人和物业。承包商应签发所需的安全规定,并确保它们正式满足。
6.6关于Porterage Services的合同,清洁,定期维护设备只能通过主管当局豁免。承包商应将审核副本发送上述豁免的副本。
6.7如果违反上文第6.1至6.6段规定的规定,审核有权通过简单的书面通知,根据意大利民法典第1456条的规定立即终止合同承包商并有权申请违反承包商的损害。

第7条分包

7.1未经Modula明确书面授权,承包商不得将订单中所列工作的全部或部分分包给第三方。如果承包商违反这一义务,Modula应当完全有权立即终止合同立即根据意大利民法典第1456条的规定,通过一个简单的书面通知承包商,有权对承包人的索赔请求。
7.2每当承包商接收到专门公司的书面授权,将特定事务所分包给特定活动或制造业务,分包的书面授权并未豁免承包商从他的合同义务,收取和责任向审核的责任豁免,这些委员会对审核案件仍然完全存在于合同关系的审核中承包商和他的分包商和/或承包商。承包商应对他的分包商活动的适当和准时履行,就像他自己一样。
7.3如果适用,承包商应当使其分包商遵守这些一般条件和承包商的其他合同文件中的所有义务和负担。
7.4如果在执行工作期间,审核处于绝对自行决定,认为分包商不适合执行分包工作,承包商在审核事先书面沟通后,必须直接履行工作而不有权获得额外的任何索赔赔偿,损害或推迟交付。

第8条技术资料和工业产权

8.1 Modula为设计、试验,向承包商提供的任何种类的技术和技术信息、文件以及模型和样品(“技术信息”),本作品的开发或制造仍应是Modula的独家财产,且只能用于订单中指明的作品的制造。承包商同意保护收到的所有信息和治疗的最大程度的机密性,同意不透露任何细节执行的活动,除了它的员工和顾问提前授权接收他们,对于那些由Modula第三方书面授权
8.2为此目的,承包商同意至少提前15(15)天将导致机密信息交流的任何事件以书面形式通知Modula。仍可理解的是,在任何此类通信或其他情况下,承包商将采取一切预防措施,以尽量减少有关通信所产生的不利影响。在合同终止后,根据上述第8.1段产生的义务将继续适用,直到有关信息因独立于承包商行为的原因落入公共领域为止。
8.3所收到的信息仍然是Modula的独家财产,承包商可仅用于履行合同和相关活动。承包商同意,只要Modula在任何时候以任何方式提出简单要求,立即将收到的任何书面信息返还给Modula。
8.4关于此类技术信息,即使终止合同后,承包商也应:
(a) 尽最大的谨慎和谨慎保存,如有要求,将其返还给Modula;
(b) 如果Modula尚未这样做,则标记与Modula的属性相同;
(c) 除非Modula明确授权,否则不得复制或复制本文件,也不得将本文件传输或披露给第三方,除非承包商的行为或违约导致本文件可供第三方使用;
(d)不适用于授予专利或其他形式的工业产权;尽管如此,如果承包商获得此类专利的授予,他应将其作为唯一所有者分配给核制品;
(e) 不得以任何理由直接或间接制造或向第三方提供通过利用技术信息设计和制造的产品;
(f)规定,并确保遵守义务,已授权通过MODULA公开的技术信息订单的执行他的雇员,分包商或第三方协同工作与他始终提供的部分所产生的这一条款的出.
当建议或同意为Modula设计和/或调整产品或向其提供产品时,承包商必须事先书面通知Modula,如有,并在适用时,与相关产品或产品中包含的部分有关的或适用的工业权利属于承包商,或由承包商在第三方许可下使用。承包商未能提供此类事先书面通知将被理解为放弃属于承包商的与Modula有关的工业权利,以及属于Modula聘用的承包商的工业权利,即使在订单完成后,也应放弃代表其制造产品的权利。未提供该通知也将被理解为Modula和上述其他承包商同意在第三方许可下获得使用承包商所使用的工业权利的授权。
8.6承包商同意不利用属于已经走到了注意力类似于那些订单覆盖,除非事先书面授权,已经从MODULA获得其他产品的制造MODULA的信息和工业产权。
8.7如果与在履行订单中进行的研究,设计,实验或开发工作,承包商就可以进行了可供选择,或者发展知识产权,它必须通知审核,并向后者提供所有信息对其生产所必需或有用的文档,同时批准修改其生产或复制的免费,非独家许可(直接和通过第三方)以及在意大利和国外销售和使用。如果本发明受工业所有权的权利或知识产权,则承包商以完全独立的方式获得了申请产品的作者权利,而且没有与在表现中进行的研究,设计,实验或开发工作无关订单,且不借鉴核制定的信息,文档或技术合作,后者将作为许可证的审议支付公平薪酬。承包商同意,如果审核所要求,在意大利和主要外国申请适当的保护本发明,或者允许调查案件以承包商的名义和代表承包商执行此操作。
8.8如果上述工作是由承包商Modula特定请求的,发明和相关工业所有权,图纸和一般技术获得的成果和知识产权将Modula的专属财产,条件是请求是由Modula以换取一定的费用。
8.9承包商保证生产、使用和商业化的产品和产品的制造中使用的部分不涉及违反第三方的工业所有权,在意大利和国外,同意立即解决任何索赔由第三方,在任何情况下,保护Modula不受该等索赔和所有可能妨碍产品无限制生产和销售的行为的影响。在所有情况下,承包商将举行Modula自由从任何责任和任何指控或主张反对使用专利、许可证、图纸、模型、商标和其他工业所有权有关的物资,材料、设备、流程和手段从事产品的制造。如果发生与该等工业所有权有关的争议,承包商同意介入并代替Modula(如果引用后者),保证Modula的辩护并偿还后者产生的所有费用和费用。
8.10如果审核有义务因上述所有权索赔的后果义务停止使用工作,承包商必须以其自费支出,必须立即保证调制,作为以下解决方案之一:
a)替换或修改作品,以避免关于使用权利的进一步争议,但不影响在所有情况下要求性能与原始产品的性能相同的要求;
b) 从Modula收回工作,退还已支付的对价。
无论如何,在任何情况下都仍然理解,承包商将责任偿还审计案件所产生的损失。
8.11承包商同意,如果Modula提出要求,在Modula给出的指示的基础上,将属于Modula的标志或其他商标或显著标志应用于工程和任何备件。在任何情况下,该申请都不能被理解为使用Modula标志的许可。因此,上述标记的作品可能只提供给Modula。无论在任何情况下,在《订单》中所设想的最后一次供货之后,Modula商标的使用都必须停止。

第9条保险

9.1除法律要求的所有保险(工伤保险、职业病等)外,承包商还应与Modula批准的保险公司一起为其员工投保所有必要的保险,以及Modula和第三方因履行订单可能对其造成的所有损害:除其他外,承包商应规定产品责任保险单。承包商必须与Modula批准的具有最高信誉的保险公司签订适当的一般和产品责任(第三方责任/工人责任/产品责任)保单。除非Modula另有要求,否则此类保单的承保限额(一般e产品责任)不得低于300万欧元。
9.2上述政策应保持充分的力相关的工作活动的整个过程,包括检查,直至竣工验收。
9.3根据Modula简单的请求,承包商应产生以上段落9.1中提到的保险政策,证明他们仍然生效,它被理解,这些政策的存在不能被视为一个限制承包商的责任规定的法律或相关订单。因此,如果损害赔偿超过保险单所承保的最高金额,承包商应直接负责。
9.4承包商应当在上述政策的修改,暂停或终止上通知调查。

第10条义务通知

10.1承包商有义务查询,从而提示向审核的审核发出与工作相关的所有事实和情况的审核,包括第三方在其责任之外由作品或供应的后果,这可能会影响或妨碍适当的责任及时履行订单。
10.2每当合同、法律或环境需要承包商的合作,以使其他Modula承包商能够执行或继续本工程时,承包商应及时、适当地提供合作。

第11条承包商代表

11.1在接受订单后,承包商应指定一名正式授权的代表,就与订单履行有关的所有问题与Modula进行沟通。
11。2 If the Work is carried out, totally or partially at Modula's premises or at the premises of a third party (e.g. Modula’s customer) the Contractor shall propose Modula, upon acceptance of the Order, the appointment of his representative who shall act as Site Supervisor. Such Site Supervisor shall fulfil all the tasks, inspections, and bear all the responsibilities related to the Work management and execution, including the technical, administrative and management activities in order to coordinate the site activities of the Contractor's personnel and as well as of Modula's or other contractors'. For this purpose, the Site Supervisor shall previously draw up a detailed work schedule and agree upon its implementation with the competent Modula and third party department where the Work is being carried out. The works shall therefore be coordinated with the other activities taking place at the same premises to guarantee the safety of the concerned workers.
11.3更具体地说,现场主管应核实该工作符合合同规定,并根据工作性质,根据经验和现有技术以及加工运营,符合所有必要措施。开展的活动,保护承包商员工的身体正直。该网站主管应专门确保采用的所有措施以及目前有效或可能生效的所有规则和规定,遵守卫生,安全和事故预防。
11.4提议的现场主管的名字是受MODULA,谁也有权在任何时候要求他的替代者,如果在其绝对酌情权,指定的人不符合必要的要求的书面批准。在任何情况下,批准或请求更换该人须而不对MODULA任何责任,并不得免除责任和赔偿责任由他的代表和他的合作者的活动获得承包商。
11.5人/ s的由承包商任命,段11.1中描述和11.2以上必须具有所需的技术能力和增强能力。
11.6应理解,必须以先前通知以书面形式向审计承担审查工作行为的承包商雇员权力的可能限制。否则承包商员工在合同履行期间执行的所有行为(例如,通过举例说,参加会议,签署信件,分钟或文件等)应被视为正式赋权的代表执行。

第12条特定设备和材料

12.1承包商必须使用自己的机器和设备来制造工作,适用于计划检查的适当校准和经过验证的仪器。这种机械和设备必须符合和维护,并以适用的健康和安全法律始终保持。承包商应在调制案件,审核案件中提供所有相关文件,以便核实承包商在此处包含的规定的遵守情况。承包商应给予修正案的要求或上述校准。
12.2 Modula为履行订单而向承包商提供的任何设备(量规、模具、钻头、特殊设备、控制设备等)将继续属于Modula的独家财产。Modula以免费贷款的方式向承包商提供这些设备的使用。只要Modula提出简单要求,设备必须归还,无需任何解释。承包商应对设备的损坏及其损失或破坏负责。
12.3对于上文第3.2段所述的设备,承包商必须:
a) 将其记录为Modula的属性;
二)安排,如果要求一种由Modula,为防止发生火灾,盗窃,破坏,自然灾害,篡改和损失或损害的其他保险的风险的风险足够的保险;
c)照顾并使用它以最大限度的照顾,并以自己的费用进行日常维护,而不会篡改或修改它,除了在从策划接收到特定书面授权后的过程/产品之后执行有关的工作。;
d)报告任何必要的特殊修理,更换,修改或重新擦亮MODULA的最大急,让MODULA可以决定采取何种行动(如有);相关费用由MODULA条件来承担,他们不发生因疏忽或承包商的其他故障,在这种情况下,所有费用由后者承担。引起的一种由Modula提供的设备或材料缺陷的任何工作的故障或缺陷,必须立即由承包商报告,否则承包商将有他们全权负责;E)避免来自承包商的工厂转移出去了,除的程度上的情况下,逐案预先商定MODULA;
f)在正常工作时间跟随经Modula访问授权的人员,检查其如何储存和使用,以及其状况,避免以任何理由将其转移给第三方,并避免提供担保;
克)避免使用它或允许它被用于除该命令的性能的其它目的,即使在相关的供应结束之后,和在任何情况下避免产生和/或传送至第三方任何基础上,直接或间接地在生产或作为备用零件,产品设计或使用它制造的使用;
h)符合审核案件给出的说明,了解其返回,抄写或保留供应到案件的任何供应;
i)检查遵守健康和安全法律;
j)按照教学和维护手册使用它;
k)确保员工有资格使用它们来实现意大利艺术品的效果.73 d.lgs。81/2008;
l)在Modula的要求下,给出关于员工的培训证明副本。
12.4如果承包商使用上述设备不当,调制保留了根据可能产生的所有此类损失向他收取给他的权利。
12.5上述第12.2、12.3和12.4段的规定,只要与属于Modula的为执行合同而交付给承包商处理的半成品和其他材料相适应,也应适用。
12.6专门开发及制造或使用承包商使工作的任何和所有设备将由承包商只生产工作中使用。如果制造或使用承包商使工作的设备是其专有财产,承包商在此授予MODULA在累计折旧后的剩余费用购买这些设备的选项。此选项会MODULA通过内无论什么原因,供应关系终止后90(九十)天发送给承包商的书面请求行使。
12.7在供应关系的任何早期或其他终止的情况下,据了解,承包商同意在其代价归还设备通过MODULA提供,或者,如果MODULA行使期权第12.6段上面提到,为客户提供设备MODULA运费已付。

第13条可靠性、质量和检查

13.1即使工程是由承包商按照Modula提供的技术和技术文件进行的,他需要执行和/或安排的执行所有的测试和/或检查需要确定使用的可靠性和适用性的工作设想以及符合意大利和欧盟法律法规的规定和指示Modula或适用于工作。上述测试和检查的结果对Modula不具有约束力,Modula保留自行进行检查和自行绝对酌情批准供应的权利。
13.2承包商应采用并保持生产和检查手段和流程,确保工程始终可靠,质量适当,并符合Modula(图纸、法规、规范、时间表、认证和/或注册样品等)规定的技术要求。承包商还应通知Modula可能提高工程质量和/或特性的所有技术创新,以及可能涉及工程质量的所有技术创新。
13.3如果工作受意大利语和/或外国法律法规的约束,关于安全,预防污染等。承包商应准备与认证和生产有关的具体文件
第页。9/20签署并批准的MODULA S.p.A。
在其中显示的过程,特别是由谁以怎样怎样,结果担心最终被测试的特性。上述文件必须由承包人至少十五(15)年保持并移交给MODULA在其请求。此外,由于MODULA是由它的客户要求允许在他们的部分检查,生产和最终测试的方法检查,承包商应允许类似的检查和巡查,在他自己的场所进行。
承包商应对其自己的分包商施加类似的义务。

第14条在流程检查中工作

14.1 MODULA有承包商的工厂,并在承包或分包方开展在正常工作时间有关工作的任何活动,以验证该作品是否正式进行,并根据条件的处所提出的免费使用为了在一个完美的熟练的方式。在这样的检查,MODULA可能会要求承包商执行特定的材料测试或其他特定的测试,以验证是如何被制造工作。
14.2承包商以其为代价,应制定更正,并进行修改,以确保工作正式按照秩序和完美的工人方式正式进行。承包商不应遵守上述内容,调查结果有权在承包商的费用中执行或拥有第三方执行的更正和重新加工。此外,调查结果有权遵守意大利民法典第1662条第2条第2条的合同。
14.3在上文第14.1和14.2段所述的情况下,工作交付条款不得延期。
14.4审核的检查不再减少或豁免承包商从正式执行工作并遵守合同中提出的所有条件以及在其中提到的文件中,并且在最终接受时不会阻止审核案件工作的测试,适用于已经检查的零件相关的缺陷或故障。

第15条设计负责性和物业修改

15.1无论工程是由承包商设计的,即使是部分设计,他对设计的质量和技术准确性负全部责任,即使该设计已得到Modula的批准。
15.2最终的整体图纸(包括布局图纸,机器互连等,如果适用)必须在制造之前副本发送到调制,以便在制造启动之前获得其批准。在设计修改的情况下,嘿必须迅速更新并交付给核制品以进行批准。如果由承包商完全或部分开发的设计需要更正或增加,以确保工作正式进行并适合最终使用,承包商必须获得审批的书面批准,并执行上述更正或添加自身的费用而不有权要求任何额外的赔偿。
15.3所有图纸和承包商制定了执行工作的论文是MODULA的专有财产,不得与那些由承包商或第三方事先专利权覆盖之外随后使用承包商。他们必须及时更新,并在他们的最终版本交付给MODULA,通过从工作的受理日期不迟于三十(30)天。
15.4每当工作设计由核制品提供时,承包商都必须提供审核人书面通知,以便正式开展工作所需的任何设计修改,并确保其适合其使用。设计修改还应包括在接受订单接受和工作的所有权转移之间产生法律或统一规定的修改的修改。除非促使所需修正或附加的书面通知,否则将在核制品中发送任何故障或缺陷,应全面承建商的收费和责任。必须使用与15.6的订单链接的写入权限指定对设计或工作的修改。以下。
15.5尽管如此,在执行工作中,应当有权提供更好的工作定义或更正之前的错误的纠正,在这种情况下,承包商应符合任何其他额外的新内容赔偿或赔偿。
15.6只有事先得到Modula明确的书面批准,承包商才能对设计或工程进行修改。承包商应该介绍一下这样修改设计或工作没有以前通知Modula和之前获得书面批准,Modula有权要求承包商自费删除修改和拒绝任何要求价格变化相关的修改。在其他情况下,对工程或项目的修改将由承包商负责。
15.7承包商必须进行Modula所订购的修改,即使这些修改的数量高于全球价格的五分之一,但不高于全球价格的一半。
15.8。由于合同是一个完整的作品和修改落入合同风险的正常范围,其他任何设计或修改工作应完全由承包商承担。
15.9。MODULA随时可能为了定性和定量削减工作。在这种情况下,价格应当按照比例减少至不执行工作的一部分。
15.10当调制要求进行修改时确定价格越来越低的价格,相关价格应相应禁止。

第十六条施工使用的材料

16.1承包商提供的用于施工的材料必须是首选的、优质的、无缺陷的材料。承包商必须自费进行适当的试验和检查,以核实上述材料的适用性。承包商还应自费并在规定的时限内取得适用法律和法规中规定的所有合格说明和证明,并应要求转交Modula。在获取文件方面的任何延误并不使承包商有权推迟工程的实施。
16.2当工程施工中使用的材料全部或部分由Modula提供时,承包商应在收到材料时检查其完好状态,并及时通知Modula任何故障或缺陷。因此,当承包商收到上述材料时,他应承担与材料缺陷相关的所有责任,但承包商在认真检查中未发现的设计和制造缺陷除外。
16.3审核部门的任何延迟均不赋予承包商索赔合同中规定的赔偿的增加,只有授权承包商在工作交付条款中授予相应的推迟。
16.4在收到和交付材料时,承包商应安排识别、储存、保管和保存上述材料,并将其纳入其库存会计系统(进货、出货、退货等)。承包商应自费重新填充因任何原因可能丢失或变质的材料,并赔偿由于该等材料的丢失或变质而给Modula造成的任何损失。
16.5应当理解的是,没有一种由Modula供给的材料可以被用于不同的目的比对工作的执行,也可以在递送部位以外被输送而不通过MODULA书面授权。

第17条完成、验证和接管测试-处罚

17.1整个工程,或如果合同明确规定,工程的各个部分,必须在交付期限内和合同规定的场所内完成,包括所有相关文件(设计文件、说明手册等),以便进行相关验证和最终测试。
17.2每当测试的验证限于工作的各个部分时,南部应仍有标题,以便进行预订或提出与已在提交最终验证和测试的零件相关的零件相关的反对意见。
17.3交货日期和订单指定的时间表约束力和必不可少的,对于这些,没有延迟或提前交货是允许的。因此,MODULA被授权在承包商的费用和风险,或电荷存储费用后返回之前约定的日期收到的物资。
17.4承包商应在开始验证和接收测试作业时,至少提前10个工作日通知Modula,这要比上文第17.1段所述的完成期限提前10个工作日。这些作业也可由Modula任命的独立视察员执行。
17.5承包商应采取必要措施,使Modula指定的检验员能够进行核查和试验,使其能够自由使用所需的一切手段(设备、检验工具等)并给予必要的合作。
17.6除与穆杜拉任命的人员有关的费用外,核查和试验费用应全部由承包商承担。
17.7完成核查和接管测试工作的工作(或在上述案件中,工作的一部分)3(三)份副本中的一分钟应按规则和由审批所指定的检查员应注意在工作中存在任何缺陷,故障或缺陷(在可能的情况下,原因和补救措施,应当陈述进行维修,修改,更换,完成工作或重新制作以消除此类缺陷的最终日期,缺陷或缺陷。这不得妨碍审核审查权,根据意大利民法典第1456条的规定,如果工作在核查和测试期间以及在保修期间,不遵守基本表现(周期 -在订单和相关规范中规定的时间,产品质量等,无损害审计员的报销权实际发生的任何额外损失的权利。
17.8承包商的意见或保留应在检查分钟中涂上,或者必须在核查和测试业务完成后写入不迟于30(三十)天(三十)天。在没有根据上述程序表达的任何意见或预订的情况下,南部的陈述应被视为承包商接受。
17.9作品的最终交付(工作的或部分如上文第17.2陈述)应发生时,验证和服用后,在测试中,MODULA明确确认其书面认可,甚至在MODULA表示保留的事件。然而,据了解,承包商应完全消除在不低于第17.10段的规定偏见一种由Modula规定的职责范围内他的费用,对任何缺陷和/或不足。
17.10如果工程未能在合同规定的交付日期内完成或Modula不接受工程,Modula有权国家新的完成日期和有权运用惩罚延误发货等于0.3%的整体工作的价格为每个日历日推迟考虑到交货条款规定的任何更大的秩序和要求赔偿损失,如果适用的话,除非待完成的工程仅被视为次要工程或完成工程。
17.11作为上文第17.10段的替代条款,Modula有权按照下文第29条终止合同,但不影响Modula对实际发生的任何额外损失的补偿权利。
17.12在任何情况下,工作应被视为审计员的默许接受,除非承包商提前通知以上关于上文第17.4段之前通知,没有理由原因,没有在60年内开展工作核查和过度测试(六十)日从承包商中陈述的日期。
17.13在事件调制中,审查审核案件,审查有权申请任何和所有保护规则,根据事件的严重性,可以触发承包商的删除和其人员,代理商和分包商,从现场,处罚或清算赔偿金,合同终止与合格承包商名单的终止和禁令。此外,调查结果应有权要求赔偿所有因素所产生的损害。
17.14为清楚起见,前几段的规定也应“作必要的修改”适用于承包商根据Modula发布的命令执行服务的任何合同。

第18条交货条件和方式

18.1标记、包装、标签、标识、运输和运输操作必须按照Modula的说明及其适用的法规进行。承包商应对因不遵守上述指示或规定而在标记、包装、标签、标识、装运和运输方面的缺陷造成的任何延误、损失或损害负责。特别是在货物运输方面,除非订单中另有规定或Modula与承包商达成协议,承包商应对货物在运输过程中可能发生的所有损坏或事故(例如盗窃、火灾、损坏、损失、等),并应只使用已获Modula批准的适用市场部门最高国际标准的承运人(即适合货物运输的运输工具、防盗系统等)。承包商应事先将保险人和承运商的名称通知Modula,以供批准。
18.2订单中规定的交付条款和计划是约束力,必不可少的,并且均未提前推迟或未分娩。因此,审核案将被授权在承包商风险和费用之前发送收到的耗材,或费用或以相​​应的存储费用向他收取。